SKY LUXURY II
Sky Luxury is a single-family villa with spacious living spaces and modern finishes for
family enjoyment or a secure investment. It features top-quality finishes and spaces designed to maximize its layout.
Features:
505 m2 lot
240 m2 construction
Entryway with double-height ceiling
Spacious living room
Open-concept dining room
Modern and spacious kitchen
4 bedrooms with dressing room and bathroom
1 guest bathroom
Swimming pool
Large patio
Pergola
Parking for 4 vehicles
Finishes:
Kitchen with quartz countertops
Beautiful wood doors
Modern modular kitchen with a 10-year warranty
Imported porcelain tile floors
P92-grade windows and sliding doors
Windows and shower screens with resistant glass
Bathrooms clad in imported ceramic tiles
High-quality leak-proof paint with a waterproof, mold-resistant adhesive
Pre-installed air conditioning in all areas and rooms
Pre-installed garden sprinklers (optional)
Blocking fee: US$ 5,000
10% Separation (20 days)
30%
During Construction
Delivery Date: 6, 12, or 18 months at the client's discretion (from the date of separation).
60%
Upon Delivery
INCLUSIONS
--
EXCLUSIONS
--
Sky Luxury is a single-family villa with spacious living spaces and modern finishes for
family enjoyment or a secure investment. It features top-quality finishes and spaces designed to maximize its layout.
Features:
505 m2 lot
240 m2 construction
Entryway with double-height ceiling
Spacious living room
Open-concept dining room
Modern and spacious kitchen
4 bedrooms with dressing room and bathroom
1 guest bathroom
Swimming pool
Large patio
Pergola
Parking for 4 vehicles
Finishes:
Kitchen with quartz countertops
Beautiful wood doors
Modern modular kitchen with a 10-year warranty
Imported porcelain tile floors
P92-grade windows and sliding doors
Windows and shower screens with resistant glass
Bathrooms clad in imported ceramic tiles
High-quality leak-proof paint with a waterproof, mold-resistant adhesive
Pre-installed air conditioning in all areas and rooms
Pre-installed garden sprinklers (optional)
Blocking fee: US$ 5,000
10% Separation (20 days)
30%
During Construction
Delivery Date: 6, 12, or 18 months at the client's discretion (from the date of separation).
60%
Upon Delivery
INCLUSIONS
--
EXCLUSIONS
--