APPARTEMENTS OPUS SANTO DOMINGO I À SAN ISIDRO AVEC PISCINE
Project of appartements benefiting from BONUS LOGEMENT, strategically located just a few minutes from the San Isidro highway.
PROJECT CHARACTERISTICS:
Security 24/24
Project clos
Green spaces
Clubhouse
Gazebo
Outdoor sports hall
Air of jeux for children
Swimming pool
Basketball Terrain
Great green spaces
Multipurpose room
APPAREL CHARACTERISTICS:
3 bedrooms
Room
Salle a manger
Cuisine
Main room with bathroom and dressing room
2 bathrooms
Balcony
Armoire à linge
Space wash
1 and 2 parking spaces
85 m2
4th level with 63 m2 terrace
(14 m2 covered with bathroom and kitchenette)
END:
Sols and bathrooms covered with imported ceramics
Comptoir in granit
Fenêtres coulissantes en aluminum et verre
Plated engineering fees
Plafonds enduits de platre
Modern modular kitchens
PAIEMENT MODE:
Reservation: 500 $US
At the signature of the contract: 3,000 USD
Pend the construction: 20%
Paiement à la livraison: 80%
Livraisons:
première étape - Immediate release
Deuxième étape - 12 months
Troisième étape - 19 months
Quatrième étape - september 2027
INCLUSIONS
--
EXCLUSIONS
--
Project of appartements benefiting from BONUS LOGEMENT, strategically located just a few minutes from the San Isidro highway.
PROJECT CHARACTERISTICS:
Security 24/24
Project clos
Green spaces
Clubhouse
Gazebo
Outdoor sports hall
Air of jeux for children
Swimming pool
Basketball Terrain
Great green spaces
Multipurpose room
APPAREL CHARACTERISTICS:
3 bedrooms
Room
Salle a manger
Cuisine
Main room with bathroom and dressing room
2 bathrooms
Balcony
Armoire à linge
Space wash
1 and 2 parking spaces
85 m2
4th level with 63 m2 terrace
(14 m2 covered with bathroom and kitchenette)
END:
Sols and bathrooms covered with imported ceramics
Comptoir in granit
Fenêtres coulissantes en aluminum et verre
Plated engineering fees
Plafonds enduits de platre
Modern modular kitchens
PAIEMENT MODE:
Reservation: 500 $US
At the signature of the contract: 3,000 USD
Pend the construction: 20%
Paiement à la livraison: 80%
Livraisons:
première étape - Immediate release
Deuxième étape - 12 months
Troisième étape - 19 months
Quatrième étape - september 2027
INCLUSIONS
--
EXCLUSIONS
--